IAC logo
IAC Assessment: BD0118
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0118
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Safety Containers
NAICS n/a
SIC 3411 - Metal Cans
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 162,660
Annual Production 450,000 Pieces
Production Hrs. Annual 4,420
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,202 2,820,926 kWh $0.03
Electricity Demand $107,464 9,854 kW-months/year $10.91
Electricity Fees $1,766 - $ -
Natural Gas $86,724 18,967 MMBtu $4.57
TOTAL ENERGY COSTS $325,153
RECOMMENDED SAVINGS* $65,369 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,428
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$32,188
Cost:
$123,000
$5,448 155,334 $7,473 634 $6,316 1,302 - - - - - - $12,951 - - - $5,448
155,334
kWh
$7,473
634
kW-months/year
$6,316
1,302
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$12,951
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,395
Cost:
$1,500
- - - - $3,395 700 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,395
700
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$2,711
Cost:
$2,400
$3,685 117,819 $1,320 134 $(-2,294) (-473) - - - - - - - - - - $3,685
117,819
kWh
$1,320
134
kW-months/year
$(-2,294)
(-473)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,529
Cost:
$3,580
$921 27,257 $608 56 - - - - - - - - - - - - $921
27,257
kWh
$608
56
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,186
Cost:
$700
$526 15,533 $660 61 - - - - - - - - - - - - $526
15,533
kWh
$660
61
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$957
Cost:
$800
$360 10,551 $597 55 - - - - - - - - - - - - $360
10,551
kWh
$597
55
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$880
Cost:
$750
$331 9,965 $549 50 - - - - - - - - - - - - $331
9,965
kWh
$549
50
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$774
Cost:
$350
$291 8,792 $483 44 - - - - - - - - - - - - $291
8,792
kWh
$483
44
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
09: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER Savings:
$755
Cost:
$300
$284 8,499 $471 43 - - - - - - - - - - - - $284
8,499
kWh
$471
43
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$501
Cost:
-
$188 5,569 $313 29 - - - - - - - - - - - - $188
5,569
kWh
$313
29
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$448
Cost:
$450
$168 4,982 $74 7 - - - - - - - - $206 - - - $168
4,982
kWh
$74
7
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$206
-
$
-
-
$
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$374
Cost:
$360
$226 6,741 $148 14 - - - - - - - - - - - - $226
6,741
kWh
$148
14
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
13: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$10,694
Cost:
$8,000
- - - - - - - - $2,238 442,000 - - $8,456 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,238
442,000
lb
-
-
$
$8,456
-
$
-
-
$
14: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$5,275
Cost:
$240
- - - - - - - - - - - - - - $5,275 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
$5,275
-
$
15: 3.4151 MINIMIZE WATER USAGE Savings:
$982
Cost:
$1,395
- - - - - - $982 106,470 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$982
106,470
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
16: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$2,340
Cost:
$2,000
- - - - - - - - - - $2,340 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$2,340
-
$
-
-
$
-
-
$
17: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$380
Cost:
-
- - - - - - - - - - - - $380 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$380
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$65,369
Cost:
$145,825
$12,428 371,042 $12,696 1,127 $7,417 1,529 $982 106,470 $2,238 442,000 $2,340 - $21,993 - $5,275 - $12,428
371,042
kWh
$12,696
1,127
kW-months/year
$7,417
1,529
MMBtu
$982
106,470
Tgal
$2,238
442,000
lb
$2,340
-
$
$21,993
-
$
$5,275
-
$
TOTAL IMPLEMENTED Savings:
$36,428
Cost:
$125,660
$7,207 207,502 $9,748 844 $6,316 1,302 - - - - - - $13,157 - - - $7,207
207,502
kWh
$9,748
844
kW-months/year
$6,316
1,302
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$13,157
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes By-product Production