IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0408 # 01 Y:2016 01 2016 PAY BILLS ON TIME TO AVOID LATE FEES $487 $0 Implemented
SU0408 # 02 Y:2016 02 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $409 $0 Implemented
SU0408 # 03 Y:2016 03 2016 INSULATE FEEDWATER TANK $48 $31 Implemented
SU0408 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,085 $952 Implemented
SU0408 # 05 Y:2016 05 2016 REPLACE BOILER $34,093 $36,000 Implemented
SU0408 # 06 Y:2016 06 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,118 $1,380 Implemented
SU0408 # 07 Y:2016 07 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $688 $1,147 Implemented
SU0408 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $1,194 $2,183 Implemented
SU0408 # 09 Y:2016 09 2016 REDUCE VENTILATION AIR $966 $2,294 Implemented
SU0408 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,057 $10,805 Not Implemented
SD0526 # 01 Y:2016 01 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $140,004 $382,500 Not Implemented
SD0526 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $47,293 $24,000 Implemented
SD0526 # 03 Y:2016 03 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,404 $21,190 Not Implemented
SD0526 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,809 $31,775 Implemented
SD0526 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,525 $47,892 Not Implemented
SD0526 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,423 $1,500 Implemented
SD0526 # 07 Y:2016 07 2016 INSTALL SET-BACK TIMERS $14,249 $344 Not Implemented
SD0526 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,558 $200 Not Implemented
SD0526 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $2,988 $1,850 Not Implemented
SD0526 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,761 $1,620 Not Implemented
SD0526 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $513 $2,320 Not Implemented
OK0935 # 01 Y:2016 01 2016 INSTALL SET-BACK TIMERS $7,525 $5,775 Not Implemented
OK0935 # 02 Y:2016 02 2016 KEEP EQUIPMENT CLEAN $4,837 $750 Not Implemented
OK0935 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $4,052 $1,913 Not Implemented
OK0935 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,207 $5,310 Not Implemented