IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0333 # 10 Y:1999 10 1999 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $-669 $1,264 Not Implemented
ND0334 # 01 Y:1999 01 1999 APPLY FOR INVESTMENT INCENTIVES $4,400 $250 Implemented
ND0334 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $358 $560 Implemented
ND0334 # 03 Y:1999 03 1999 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $22,061 $57,704 Implemented
ND0334 # 04 Y:1999 04 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,512 $500 Not Implemented
ND0334 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $962 $1,000 Not Implemented
ND0334 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $13,400 $6,000 Not Implemented
ND0334 # 07 Y:1999 07 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,416 $250 Not Implemented
ND0334 # 08 Y:1999 08 1999 COVER OPEN TANKS $486 $450 Not Implemented
ND0334 # 09 Y:1999 09 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $319 $143 Not Implemented
ND0334 # 10 Y:1999 10 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $200 Implemented
ND0334 # 11 Y:1999 11 1999 SELL OIL TO RECYCLER $900 $2,000 Not Implemented
ND0334 # 12 Y:1999 12 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $528 $0 Not Implemented
ND0332 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,688 $750 Not Implemented
ND0332 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,197 $7,544 Not Implemented
ND0332 # 03 Y:1999 03 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $117 $40 Implemented
ND0332 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-61 $1,560 Not Implemented
ND0332 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,668 $500 Implemented
ND0332 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,580 $480 Implemented
ND0332 # 07 Y:1999 07 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,577 $1,200 Implemented
ND0332 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $721 $1,334 Not Implemented
ND0328 # 01 Y:1999 01 1999 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $12,717 $27,395 Implemented
ND0328 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $8,575 $1,100 Not Implemented
ND0328 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,212 $7,590 Implemented
ND0328 # 04 Y:1999 04 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $912 $950 Implemented