IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0439 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,009 $0 Not Implemented
UD0439 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,183 $1,500 Not Implemented
UD0439 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,763 $12,575 Not Implemented
UD0433 # 01 Y:1994 01 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,342 $20,000 Not Implemented
UD0433 # 02 Y:1994 02 1994 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,410 $0 Implemented
UD0433 # 03 Y:1994 03 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,059 $300 Implemented
UD0433 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,093 $2,500 Not Implemented
UD0433 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,315 $1,950 Implemented
UM0005 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,350 $7,970 Implemented
UM0005 # 02 Y:1994 02 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $970 $500 Implemented
UM0005 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,410 $9,428 Implemented
UM0005 # 04 Y:1994 04 1994 COVER OPEN TANKS $6,181 $4,762 Not Implemented
UM0005 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $600 Implemented
UM0005 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $561 $200 Implemented
UM0005 # 07 Y:1994 07 1994 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $17,300 $6,600 Implemented
UM0005 # 08 Y:1994 08 1994 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $40,230 $34,000 Implemented
SD0088 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,963 $4,300 Implemented
SD0088 # 02 Y:1994 02 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,722 $200 Implemented
SD0088 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $376 $235 Implemented
SD0088 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,853 $150 Implemented
SD0088 # 05 Y:1994 05 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $117,014 $245,000 Implemented
SD0088 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,436 $95,019 Implemented
SD0088 # 07 Y:1994 07 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $39,115 $43,220 Implemented
SD0088 # 08 Y:1994 08 1994 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $4,548 $810 Implemented
MS0002 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $7,089 $9,000 Not Implemented