Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,102
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2426 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,975 | $5,960 | n/a |
KS2426 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,733 | $150 | n/a |
KS2426 # 04 Y:2024 | 04 | 2024 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $383 | $728 | n/a |
KS2426 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,414 | $62,011 | n/a |
KS2426 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $7,670 | $12,820 | n/a |
KS2426 # 07 Y:2024 | 07 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,143 | $67,309 | n/a |
WV0658 # 01 Y:2024 | 01 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $46,042 | $4,000 | Implemented |
WV0658 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,234 | $90,000 | Not Implemented |
WV0658 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $12,543 | $934 | Implemented |
WV0658 # 04 Y:2024 | 04 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,305 | $1,500 | Implemented |
WV0658 # 05 Y:2024 | 05 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $10,700 | $3,650 | Implemented |
WV0658 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,787 | $900 | Implemented |
WV0658 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,056 | $7,004 | Implemented |
WV0658 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,674 | $10,167 | Not Implemented |
WV0658 # 09 Y:2024 | 09 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,325 | $952 | Implemented |
MZ1003 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $542 | $1,660 | n/a |
MZ1003 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $10,196 | $78,000 | n/a |
MZ1003 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $349 | $1,000 | n/a |
WM0219 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $35,918 | $200,000 | n/a |
WM0219 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,902 | $3,000 | n/a |
WM0219 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,325 | $6,594 | n/a |
WM0219 # 04 Y:2024 | 04 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,229 | $0 | n/a |
WM0219 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,556 | $0 | n/a |
WM0219 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $918 | $2,370 | n/a |
UF0611 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $99,213 | $111,120 | n/a |