IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0002 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,830 $1,000 Not Implemented
MS0002 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,387 $105,500 Not Implemented
MS0002 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $1,728 $1,880 Not Implemented
MS0002 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,060 $9,500 Not Implemented
MO0121 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,377 $13,819 Implemented
MO0121 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,359 $550 Implemented
MO0121 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,411 $335 Not Implemented
MO0121 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $6,204 Implemented
MO0121 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $980 Not Implemented
MO0121 # 06 Y:1994 06 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $436 $25 Not Implemented
MO0121 # 07 Y:1994 07 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,132 $1,195 Not Implemented
MA0307 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,261 $2,533 Not Implemented
MA0307 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $756 $99 Implemented
MA0307 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,970 $886 Implemented
MA0307 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $648 Implemented
MA0307 # 05 Y:1994 05 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $906 $3,063 Implemented
MA0307 # 06 Y:1994 06 1994 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $1,747 $0 Not Implemented
MA0307 # 07 Y:1994 07 1994 REUSE / RECYCLE/ SELL PAPER PRODUCTS $666 $540 Implemented
GT0529 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,460 $34,270 Implemented
GT0529 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,780 $9,250 Not Implemented
GT0529 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,040 $1,350 Not Implemented
GT0529 # 04 Y:1994 04 1994 ISOLATE HOT OR COLD EQUIPMENT $430 $800 Not Implemented
GT0529 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,600 $74,700 Not Implemented
GT0529 # 06 Y:1994 06 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $22,900 $4,000 Implemented
GT0529 # 07 Y:1994 07 1994 OPERATE BOILERS ON HIGH FIRE SETTING $12,370 $0 Not Implemented