IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1036 # 09 Y:2022 09 2022 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,334 $63,686 Not Implemented
UD1036 # 10 Y:2022 10 2022 INSTALL OCCUPANCY SENSORS $1,706 $3,200 Not Implemented
AM0844 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $101,477 $114,525 Implemented
AM0844 # 02 Y:2022 02 2022 MINIMIZE WATER USAGE $30,169 $3,770 Not Implemented
AM0844 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $9,263 $3,900 Implemented
AM0844 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,138 $331 Implemented
AM0844 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $854 $625 Implemented
AS0516 # 01 Y:2022 01 2022 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $24,479 $45,639 Not Implemented
AS0516 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $407 $133 Implemented
AS0516 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,894 $22,335 Not Implemented
AS0516 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,838 $170,361 Implemented
AS0516 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $49 $165 Implemented
AS0516 # 06 Y:2022 06 2022 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $278 $189 Not Implemented
SU0512 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $15 $0 Not Implemented
SU0512 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $911 $0 Not Implemented
SU0512 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $80 $0 Not Implemented
SU0512 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,693 $1,147 Not Implemented
SU0512 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $541 $506 Not Implemented
SU0512 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $67 $116 Not Implemented
SU0512 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $644 $1,362 Not Implemented
UU0200 # 01 Y:2022 01 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $41,228 $52,800 Not Implemented
UU0200 # 02 Y:2022 02 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,992 $10,000 Not Implemented
UU0200 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,392 $5,232 Implemented
IC0258 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $875 $50 Not Implemented
IC0258 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $1,297 Not Implemented