Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0279 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,961 | $8,285 | Not Implemented |
AS0279 # 07 Y:2000 | 07 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,617 | $1,591 | Not Implemented |
AS0279 # 08 Y:2000 | 08 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $573 | $600 | Not Implemented |
AS0279 # 09 Y:2000 | 09 | 2000 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,632 | $120 | Not Implemented |
AS0279 # 10 Y:2000 | 10 | 2000 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $421 | $110 | Implemented |
AS0279 # 11 Y:2000 | 11 | 2000 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $28,870 | $4,880 | Implemented |
SD0251 # 01 Y:2000 | 01 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,187 | $350 | Not Implemented |
SD0251 # 02 Y:2000 | 02 | 2000 | INSULATE BARE EQUIPMENT | $4,966 | $664 | Not Implemented |
SD0251 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,693 | $5,000 | Not Implemented |
SD0251 # 04 Y:2000 | 04 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,316 | $5,000 | Not Implemented |
SD0251 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,040 | $200 | Implemented |
SD0251 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,438 | $1,438 | Implemented |
SD0251 # 07 Y:2000 | 07 | 2000 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,315 | $1,000 | Not Implemented |
SD0251 # 08 Y:2000 | 08 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,240 | $7,900 | Implemented |
SD0251 # 09 Y:2000 | 09 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $75,350 | $10,050 | Not Implemented |
NV0154 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $700 | $100 | n/a |
NV0154 # 02 Y:2000 | 02 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,139 | $370 | n/a |
NV0154 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,943 | $6,800 | n/a |
NV0154 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,090 | $24,980 | n/a |
NV0154 # 05 Y:2000 | 05 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,857 | $1,060 | n/a |
NV0154 # 06 Y:2000 | 06 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $3,650 | $560 | n/a |
TP0019 # 01 Y:2000 | 01 | 2000 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $43,452 | $10,000 | Not Implemented |
TP0019 # 02 Y:2000 | 02 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $3,622 | $20,000 | Not Implemented |
TP0019 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $368 | $2,161 | Implemented |
TP0019 # 04 Y:2000 | 04 | 2000 | INSTALL OCCUPANCY SENSORS | $190 | $308 | Implemented |