IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0279 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,961 $8,285 Not Implemented
AS0279 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,617 $1,591 Not Implemented
AS0279 # 08 Y:2000 08 2000 INSTALL TIMERS AND/OR THERMOSTATS $573 $600 Not Implemented
AS0279 # 09 Y:2000 09 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,632 $120 Not Implemented
AS0279 # 10 Y:2000 10 2000 ELIMINATE LEAKS IN WATER LINES AND VALVES $421 $110 Implemented
AS0279 # 11 Y:2000 11 2000 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $28,870 $4,880 Implemented
SD0251 # 01 Y:2000 01 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $9,187 $350 Not Implemented
SD0251 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $4,966 $664 Not Implemented
SD0251 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,693 $5,000 Not Implemented
SD0251 # 04 Y:2000 04 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,316 $5,000 Not Implemented
SD0251 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,040 $200 Implemented
SD0251 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,438 $1,438 Implemented
SD0251 # 07 Y:2000 07 2000 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,315 $1,000 Not Implemented
SD0251 # 08 Y:2000 08 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,240 $7,900 Implemented
SD0251 # 09 Y:2000 09 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $75,350 $10,050 Not Implemented
NV0154 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $100 n/a
NV0154 # 02 Y:2000 02 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,139 $370 n/a
NV0154 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,943 $6,800 n/a
NV0154 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,090 $24,980 n/a
NV0154 # 05 Y:2000 05 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,857 $1,060 n/a
NV0154 # 06 Y:2000 06 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $3,650 $560 n/a
TP0019 # 01 Y:2000 01 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $43,452 $10,000 Not Implemented
TP0019 # 02 Y:2000 02 2000 RECOVER AND REUSE WASTE MATERIAL $3,622 $20,000 Not Implemented
TP0019 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $368 $2,161 Implemented
TP0019 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $190 $308 Implemented