IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0305 # 08 Y:1994 08 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,255 $7,730 Not Implemented
CO0305 # 09 Y:1994 09 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,010 $30 Not Implemented
CO0305 # 10 Y:1994 10 1994 INSTALL OCCUPANCY SENSORS $1,450 $1,700 Not Implemented
CO0305 # 11 Y:1994 11 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $1,290 $1,190 Implemented
AS0120 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,087 $49,812 Not Implemented
AS0120 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,051 $320 Not Implemented
AS0120 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,591 $158 Not Implemented
AS0120 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $1,081 $975 Not Implemented
AS0120 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $785 $480 Not Implemented
AS0120 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $168 $200 Not Implemented
AS0120 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,178 $10,473 Not Implemented
AS0120 # 08 Y:1994 08 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,525 $0 Not Implemented
AS0120 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,598 $500 Not Implemented
AS0120 # 10 Y:1994 10 1994 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $54,627 $156,250 Not Implemented
AS0120 # 11 Y:1994 11 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5,947 $2,800 Not Implemented
AS0120 # 12 Y:1994 12 1994 USE CASCADE SYSTEM OF RECIRCULATING DURING COLD WEATHER TO AVOID SUB-COOLING $10,690 $20,000 Not Implemented
AS0120 # 13 Y:1994 13 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,746 $4,972 Not Implemented
AS0120 # 14 Y:1994 14 1994 INSULATE BARE EQUIPMENT $11,350 $40,000 Not Implemented
AS0120 # 15 Y:1994 15 1994 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $305,831 $1,059,725 Not Implemented
SF0030 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,894 $6,328 Implemented
SF0030 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,436 $25,500 Not Implemented
SF0030 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,671 $1,056 Implemented
SF0030 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,370 $6,101 Implemented
SF0030 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,504 $10,968 Not Implemented
SF0030 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $2,101 $2,758 Not Implemented