IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0033 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,854 $370 Not Implemented
LM0033 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $23,073 $31,000 Not Implemented
LM0033 # 05 Y:2002 05 2002 USE OPTIMUM THICKNESS INSULATION $64,833 $96,800 Not Implemented
LM0033 # 06 Y:2002 06 2002 UTILIZE OUTSIDE CONTRACTING $22,623 $12,000 Not Implemented
LM0033 # 07 Y:2002 07 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $243,003 $208,000 Not Implemented
LM0033 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $237,812 $70,000 Not Implemented
LM0033 # 09 Y:2002 09 2002 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $90,240 $34,800 Not Implemented
LM0033 # 10 Y:2002 10 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $231,120 $395,000 Not Implemented
MA0511 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $38,495 $4,090 Implemented
MA0511 # 02 Y:2002 02 2002 APPLY FOR INVESTMENT INCENTIVES $15,314 $0 Implemented
MA0511 # 03 Y:2002 03 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,764 $14,100 Implemented
MA0511 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,282 $6,950 Implemented
MA0511 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $605 $0 Implemented
MA0511 # 06 Y:2002 06 2002 PAY BILLS ON TIME TO AVOID LATE FEES $483 $0 Implemented
MA0511 # 07 Y:2002 07 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $249 $0 Implemented
MA0511 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $86 $350 Implemented
OK0638 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $6,131 $0 Not Implemented
OK0638 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,120 $6,442 Implemented
OK0638 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,798 $862 Implemented
OK0638 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $485 $0 Not Implemented
OK0638 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,536 $500 Not Implemented
OK0638 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $623 $1,067 Implemented
OK0638 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,046 $10 Not Implemented
MI0036 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $52 Implemented
MI0036 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $929 $2 Not Implemented