Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
314
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0316 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,048 | $39,293 | Not Implemented |
UF0316 # 03 Y:2003 | 03 | 2003 | INSTALL SKYLIGHTS | $2,373 | $4,104 | Not Implemented |
UF0316 # 04 Y:2003 | 04 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,100 | $1,073 | Not Implemented |
UF0316 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $993 | $0 | Implemented |
UF0316 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,383 | $340 | Implemented |
UF0316 # 07 Y:2003 | 07 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $4,496 | $4,860 | Not Implemented |
UF0316 # 08 Y:2003 | 08 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,247 | $0 | Not Implemented |
UF0316 # 09 Y:2003 | 09 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,064 | $5,000 | Implemented |
UF0316 # 10 Y:2003 | 10 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,300 | $41,637 | Implemented |
UF0316 # 11 Y:2003 | 11 | 2003 | OPTIMIZE PLANT POWER FACTOR | $15,362 | $9,000 | Not Implemented |
UF0316 # 12 Y:2003 | 12 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,000 | $0 | Not Implemented |
MI0051 # 01 Y:2003 | 01 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $387 | $525 | Implemented |
MI0051 # 02 Y:2003 | 02 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $480 | $969 | Not Implemented |
MI0051 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,154 | $0 | Not Implemented |
UF0315 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,085 | $353 | Implemented |
UF0315 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,831 | $4,121 | Implemented |
UF0315 # 03 Y:2003 | 03 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $903 | $3,000 | Not Implemented |
UF0315 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,378 | $0 | Not Implemented |
UF0315 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,039 | $1,906 | Implemented |
UF0315 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $3,905 | $1,281 | Not Implemented |
UF0315 # 07 Y:2003 | 07 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $14,685 | $20,500 | Not Implemented |
UF0315 # 08 Y:2003 | 08 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,301 | $260 | Implemented |
UF0315 # 09 Y:2003 | 09 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,266 | $1,895 | Not Implemented |
UF0314 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,414 | $8,936 | Implemented |
UF0314 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,569 | $2,000 | Not Implemented |