IAC logo
IAC Assessment: UF0314
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0314
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2003
Principal Product Fragrances
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2087 - Flavoring Extracts And Syrups, Nec
Sales $50,000,000-$100,000,000
# of Employees 179
Plant Area (Sq.Ft.) 73,000
Annual Production 100,000 Pieces
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,106 3,379,839 kWh $0.03
Electricity Demand $34,805 861 kW-months/year $40.42
Natural Gas $29,609 5,027 MMBtu $5.89
TOTAL ENERGY COSTS $556,460
RECOMMENDED SAVINGS* $691,460 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $94,985
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,414
Cost:
$8,936
$7,913 232,735 $2,501 28 - - - - - - $7,913
232,735
kWh
$2,501
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,569
Cost:
$2,000
$4,569 99,331 - - - - - - - - $4,569
99,331
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$51,357
Cost:
$165,670
$37,701 1,108,858 $13,656 621 - - - - - - $37,701
1,108,858
kWh
$13,656
621
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$84,571
Cost:
$191,945
$65,923 1,938,915 $18,648 212 - - - - - - $65,923
1,938,915
kWh
$18,648
212
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$29,609
Cost:
$3,005
- - - - $29,609 5,027 - - - - -
-
kWh
-
-
kW-months/year
$29,609
5,027
MMBtu
-
-
Tgal
-
-
$
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$375,940
Cost:
$302,000
- - - - - - $375,940 95,659,200 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$375,940
95,659,200
Tgal
-
-
$
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$135,000
Cost:
$32,000
- - - - - - - - $135,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$135,000
-
$
TOTAL RECOMMENDED Savings:
$691,460
Cost:
$705,556
$116,106 3,379,839 $34,805 861 $29,609 5,027 $375,940 95,659,200 $135,000 - $116,106
3,379,839
kWh
$34,805
861
kW-months/year
$29,609
5,027
MMBtu
$375,940
95,659,200
Tgal
$135,000
-
$
TOTAL IMPLEMENTED Savings:
$94,985
Cost:
$200,881
$73,836 2,171,650 $21,149 240 - - - - - - $73,836
2,171,650
kWh
$21,149
240
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes