IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

906

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0099 # 05 Y:2017 05 2017 TREAT AND REUSE RINSE WATERS $773 $7,514 Not Implemented
BS0099 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $456 $7 Not Implemented
BS0099 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $428 $308 Not Implemented
BS0099 # 08 Y:2017 08 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $135 $13 Not Implemented
BS0099 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $50 $260 Not Implemented
BS0097 # 01 Y:2017 01 2017 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,590 $2,959 Not Implemented
BS0097 # 02 Y:2017 02 2017 TREAT AND REUSE RINSE WATERS $870 $8,674 Not Implemented
BS0097 # 03 Y:2017 03 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $6,781 $127,800 Not Implemented
BS0097 # 04 Y:2017 04 2017 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $751 $5,250 Not Implemented
BS0097 # 05 Y:2017 05 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $319 $2,189 Not Implemented
BS0097 # 06 Y:2017 06 2017 ADOPT IN-HOUSE MATERIAL GENERATION $3,137 $60,000 Not Implemented
BS0097 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $236 $131 Not Implemented
BS0097 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $212 $277 Not Implemented
BS0097 # 09 Y:2017 09 2017 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $140 $160 Not Implemented
BS0095 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $9,634 $1,202 Implemented
BS0095 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,164 $45,960 Not Implemented
BS0095 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,935 $15,234 Not Implemented
BS0095 # 04 Y:2017 04 2017 OPTIMIZE PLANT POWER FACTOR $9,156 $20,491 Not Implemented
BS0095 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,362 $1,171 Not Implemented
BS0095 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,327 $128 Implemented
BS0095 # 07 Y:2017 07 2017 UPGRADE CONTROLS ON COMPRESSORS $9,891 $13,498 Not Implemented
BS0095 # 08 Y:2017 08 2017 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $10,520 $21,040 Not Implemented
BS0093 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,874 $500 Not Implemented
BS0093 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $4,977 Not Implemented
BS0093 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $146 $30 Not Implemented