IAC Assessment: BS0100
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BS0100
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Boise State University
Assessment Year 2017
Principal Product Trailers
NAICS 336212 - Truck Trailer Manufacturing
SIC 3715 - Truck Trailers
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 566,280
Annual Production 350 Pieces
Production Hrs. Annual 2,600
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,730 759,298 kWh $0.06
Electricity Demand $23,979 4,890 kW-months/year $4.90
Electricity Fees $1,012 - $ -
Natural Gas $33,478 5,186 MMBtu $6.46
LPG $5,634 100 MMBtu $56.34
TOTAL ENERGY COSTS $121,755
RECOMMENDED SAVINGS* $12,424 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,619
Cost:
$437
$1,619 26,308 - - - - $1,619
26,308
kWh
-
-
kW-months/year
-
-
MMBtu
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$247
Cost:
$89
$247 4,007 - - - - $247
4,007
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$703
Cost:
$90
$517 8,399 $186 38 - - $517
8,399
kWh
$186
38
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$284
Cost:
$39
$284 4,619 - - - - $284
4,619
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$640
Cost:
$8
$640 10,400 - - - - $640
10,400
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$80
Cost:
$100
$36 582 $44 9 - - $36
582
kWh
$44
9
kW-months/year
-
-
MMBtu
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,572
Cost:
$14,699
$(-1,440) (-23,400) - - $6,012 936 $(-1,440)
(-23,400)
kWh
-
-
kW-months/year
$6,012
936
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$488
Cost:
$564
$(-122) (-1,981) - - $610 95 $(-122)
(-1,981)
kWh
-
-
kW-months/year
$610
95
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,791
Cost:
$16,366
$2,693 43,758 $1,098 224 - - $2,693
43,758
kWh
$1,098
224
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,424
Cost:
$32,392
$4,474 72,692 $1,328 271 $6,622 1,031 $4,474
72,692
kWh
$1,328
271
kW-months/year
$6,622
1,031
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas