IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0265 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $705 $304 Implemented
IC0265 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,312 $7,533 Implemented
IC0265 # 04 Y:2022 04 2022 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $19,650 $2,435 Not Implemented
IC0263 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $32,000 $174,422 Implemented
IC0263 # 02 Y:2022 02 2022 REPLACE BOILER $4,029 $54,022 Implemented
IC0263 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,790 $4,197 Not Implemented
IC0263 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $166 $280 Implemented
IC0262 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,327 $4,150 Not Implemented
IC0262 # 02 Y:2022 02 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $356 $5,338 Not Implemented
IC0262 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,351 $33,110 Not Implemented
IC0261 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,140 $789 Implemented
IC0261 # 02 Y:2022 02 2022 REPAIR AND ELIMINATE STEAM LEAKS $4,207 $360 Implemented
IC0261 # 03 Y:2022 03 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $2,477 $1,392 Implemented
IC0261 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $22,735 Implemented
IC0261 # 05 Y:2022 05 2022 METER WASTE WATER $695 $600 Implemented
WM0178 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $120 $500 Not Implemented
WM0178 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $139 $0 Implemented
WM0178 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $154 $0 Implemented
WM0178 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $189 $0 Implemented
WM0178 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $2,564 Implemented
WM0178 # 01 Y:2022 01 2022 USE SYNTHETIC LUBRICANT $4,241 $8,000 Not Implemented
IC0260 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,208 $1,715 Not Implemented
IC0260 # 02 Y:2022 02 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,139 $0 Not Implemented
IC0260 # 03 Y:2022 03 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,387 $3,452 Not Implemented
IC0260 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,800 $0 Not Implemented