Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,443
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0044 # 06 Y:2020 | 06 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $111 | $50 | Implemented |
NL0043 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,480 | $37,056 | Not Implemented |
NL0043 # 02 Y:2020 | 02 | 2020 | KEEP EQUIPMENT CLEAN | $10,419 | $41,591 | Not Implemented |
NL0043 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,824 | $25,408 | Not Implemented |
NL0043 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,551 | $70 | Implemented |
NL0043 # 05 Y:2020 | 05 | 2020 | USE RADIANT HEATER FOR SPOT HEATING | $1,657 | $2,700 | Not Implemented |
NL0043 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,010 | $1,108 | Implemented |
NL0043 # 07 Y:2020 | 07 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $920 | $70 | Not Implemented |
NL0043 # 08 Y:2020 | 08 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $719 | $135 | Implemented |
NL0041 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $238,833 | $700,000 | Implemented |
NL0041 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $10,636 | $52,000 | Implemented |
NL0041 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,751 | $600 | Implemented |
NL0041 # 04 Y:2019 | 04 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,670 | $100 | Implemented |
NL0041 # 05 Y:2019 | 05 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $5,000 | $19,750 | Implemented |
NL0041 # 06 Y:2019 | 06 | 2019 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $2,618 | $3,180 | Not Implemented |
NL0041 # 07 Y:2019 | 07 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $2,123 | $200 | Implemented |
NL0041 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197 | $674 | Implemented |
NL0040 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $106,822 | $130,000 | Not Implemented |
NL0040 # 02 Y:2019 | 02 | 2019 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $38,925 | $150,000 | Not Implemented |
NL0040 # 03 Y:2019 | 03 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $25,402 | $1,697 | Implemented |
NL0040 # 04 Y:2019 | 04 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $16,450 | $4,500 | Implemented |
NL0040 # 05 Y:2019 | 05 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $10,400 | $51,350 | Implemented |
NL0040 # 06 Y:2019 | 06 | 2019 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $9,900 | $3,660 | Not Implemented |
NL0040 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,049 | $18,439 | Implemented |
NL0040 # 08 Y:2019 | 08 | 2019 | RECYCLE WHITE WATER | $2,649 | $1,000 | Implemented |