IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0575 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,476 $4,242 Not Implemented
SD0575 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $718 $0 Implemented
SD0575 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $441 $540 Not Implemented
SD0575 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $142 $218 Not Implemented
LS1904 # 01 Y:2019 01 2019 REPAIR AND ELIMINATE STEAM LEAKS $18,805 $0 Implemented
LS1904 # 02 Y:2019 02 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,536 $0 Implemented
LS1904 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $414,085 $84,000 Not Implemented
LS1904 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,713 $1,530 Not Implemented
LS1904 # 05 Y:2019 05 2019 REDUCE EXCESSIVE BOILER BLOWDOWN $20,231 $10,000 Not Implemented
LS1904 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,763 $45,810 Implemented
LS1904 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,052 $20,000 Not Implemented
MI0346 # 01 Y:2019 01 2019 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $33,896 $289,880 Not Implemented
MI0346 # 02 Y:2019 02 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $14,613 $8,320 Implemented
MI0346 # 03 Y:2019 03 2019 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $10,140 $8,840 Not Implemented
MI0346 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,108 $3,480 Implemented
MI0346 # 05 Y:2019 05 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,147 $40,000 Implemented
MI0346 # 06 Y:2019 06 2019 INCREASE EFFICIENCY OF TRUCKS $3,675 $4,060 Not Implemented
MI0346 # 07 Y:2019 07 2019 COMBINE UTILITY METERS $730 $240 Implemented
MI0346 # 08 Y:2019 08 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $510 $165 Implemented
MI0346 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $308 $395 Not Implemented
MA0796 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,315 $14,350 Not Implemented
MA0796 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,245 $6,660 Not Implemented
MA0796 # 03 Y:2019 03 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,193 $200 Implemented
MA0796 # 04 Y:2019 04 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,678 $300 Not Implemented
MA0796 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,405 $2,499 Implemented