IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0001 # 04 Y:2012 04 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,535 $1,894 Not Implemented
BS0001 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $1,616 Implemented
BS0001 # 06 Y:2012 06 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,034 $200 Implemented
BS0001 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $160 Implemented
BS0001 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,474 $5,640 Not Implemented
BS0001 # 09 Y:2012 09 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,158 $2,282 Implemented
UMS007 # 01 Y:2012 01 2012 OPERATE BOILERS ON HIGH FIRE SETTING $1,630,000 $0 Not Implemented
UMS007 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $480,000 $800,000 Implemented
UMS007 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $157,000 $200,000 Not Implemented
UMS007 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $85,000 $100,000 Not Implemented
MI0220 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,181 $52,934 Not Implemented
MI0220 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $13,778 $1,800 Implemented
MI0220 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,280 $1,660 Implemented
MI0220 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,676 $20,320 Not Implemented
MI0220 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,448 $80 Implemented
MI0220 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $5,329 $40 Implemented
MI0220 # 07 Y:2012 07 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,050 $200 Implemented
MI0220 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,863 $5,850 Not Implemented
MI0220 # 09 Y:2012 09 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,772 $545 Not Implemented
MI0220 # 10 Y:2012 10 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $2,072 $5,800 Not Implemented
MI0220 # 11 Y:2012 11 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,014 $320 Implemented
MI0220 # 12 Y:2012 12 2012 INSTALL SKYLIGHTS $978 $1,920 Implemented
MI0220 # 13 Y:2012 13 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $906 $208 Implemented
MI0219 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,003 $37,014 Implemented
MI0219 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,275 $1,660 Implemented