IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,102

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0562 # 05 Y:2024 05 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $727 $1,000 n/a
LE0562 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,738 $13,669 n/a
LE0562 # 07 Y:2024 07 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,491 $8,000 n/a
LE0562 # 08 Y:2024 08 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $13,989 $60,600 n/a
OR0788 # 01 Y:2024 01 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $126,866 $2,500,000 Implemented
OR0788 # 02 Y:2024 02 2024 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $25,469 $250,000 Not Implemented
OR0788 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,448 $150,000 Not Implemented
OR0788 # 04 Y:2024 04 2024 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $6,183 $30,000 Not Implemented
OR0788 # 05 Y:2024 05 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,766 $200,000 Not Implemented
OR0788 # 06 Y:2024 06 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $2,489 $150,000 Not Implemented
MZ0357 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,213 $18,604 n/a
MZ0357 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,288 $440 n/a
MZ0357 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,034 $10,040 n/a
MZ0357 # 04 Y:2024 04 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,721 $18,298 n/a
MZ0357 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $482 $2,100 n/a
MZ0357 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,080 $8,267 n/a
MZ0357 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $78,903 $852,600 n/a
UF0610 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $108,899 $322,608 n/a
UF0610 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $28,883 $18,333 n/a
UF0610 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,012 $25,400 n/a
UF0610 # 04 Y:2024 04 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,119 $36,000 n/a
UF0610 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $4,345 $2,330 n/a
UF0610 # 06 Y:2024 06 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,691 $5,108 n/a
UF0610 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,062 $7,200 n/a
UF0610 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $1,315 $4,000 n/a