IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0082 # 06 Y:1990 06 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $103 $182 Implemented
OR0082 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $498 $700 Implemented
OR0082 # 08 Y:1990 08 1990 OPTIMIZE PLANT POWER FACTOR $161 $450 Not Implemented
OR0083 # 01 Y:1990 01 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,850 $0 Implemented
OR0083 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $20,444 $16,800 Not Implemented
OR0083 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,646 $5,000 Implemented
OR0083 # 04 Y:1990 04 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,439 $46,216 Not Implemented
OR0083 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $190 $490 Not Implemented
OR0081 # 01 Y:1990 01 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,762 $68,000 Implemented
OR0081 # 02 Y:1990 02 1990 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,741 $635 Implemented
OR0081 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,720 $10,000 Implemented
OR0081 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,690 $1,924 Not Implemented
OR0081 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $137 $324 Implemented
OR0079 # 01 Y:1990 01 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,596 $312 Not Implemented
OR0079 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $148 $50 Implemented
OR0079 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,902 $1,000 Implemented
OR0079 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $473 $1,200 Not Implemented
OR0079 # 05 Y:1990 05 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,374 $31,672 Not Implemented
OR0080 # 01 Y:1990 01 1990 REDUCE VENTILATION AIR $5,914 $0 Implemented
OR0080 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,416 $319 Not Implemented
OR0080 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,590 $1,500 Implemented
OR0080 # 04 Y:1990 04 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,957 $0 Implemented
OR0080 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $569 $660 Implemented
OR0080 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $660 Not Implemented
OR0076 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,574 $1,000 Implemented