IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,821

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0294 # 11 Y:2023 11 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $88 $100 Implemented
CI0014 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,109 $26,411 n/a
CI0014 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $14,087 $30,000 n/a
CI0014 # 03 Y:2023 03 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,997 $44,000 n/a
CI0014 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $10,477 $35,642 n/a
CI0014 # 05 Y:2023 05 2023 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $9,748 $5,000 n/a
CI0014 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $8,621 $5,200 n/a
CI0014 # 07 Y:2023 07 2023 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $8,233 $4,400 n/a
CI0014 # 08 Y:2023 08 2023 USE PHOTOCELL CONTROLS $7,117 $3,300 n/a
KS2316 # 01 Y:2023 01 2023 REPAIR AND ELIMINATE STEAM LEAKS $11,534 $2,766 Implemented
KS2316 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,197 $1,784 Not Implemented
KS2316 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,228 $2,463 Not Implemented
KS2316 # 04 Y:2023 04 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,417 $0 Not Implemented
KS2316 # 05 Y:2023 05 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,127 $627,000 Not Implemented
KS2316 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,198 $29,442 Not Implemented
KS2316 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $7,751 $6,350 Not Implemented
KS2316 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,336 $29,920 Implemented
KS2316 # 09 Y:2023 09 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $49,691 $246,356 Implemented
KS2316 # 10 Y:2023 10 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,892 $156,412 Implemented
KS2316 # 11 Y:2023 11 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $52,146 $422,182 Not Implemented
AS0548 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $87,415 $1,061,947 Implemented
AS0548 # 02 Y:2023 02 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $9,740 $208 Implemented
AS0548 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,109 $5,233 Implemented
AS0548 # 04 Y:2023 04 2023 INSTALL TIMERS AND/OR THERMOSTATS $3,626 $9,286 Implemented
AS0548 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,351 $1,947 Implemented