IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0434 # 12 Y:2010 12 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,125 $2,284 Not Implemented
UF0434 # 13 Y:2010 13 2010 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $1,875 $10,480 Not Implemented
UF0434 # 14 Y:2010 14 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,568 $0 Not Implemented
UF0434 # 15 Y:2010 15 2010 RECYCLE FLUORESCENT LAMPS $571 $3,405 Not Implemented
UF0433 # 01 Y:2010 01 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,771 $2,321 Not Implemented
UF0433 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,098 $314 Implemented
UF0433 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,138 $8,558 Not Implemented
UF0433 # 04 Y:2010 04 2010 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $21,987 $10,000 Not Implemented
UF0433 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,205 $0 Implemented
UF0433 # 06 Y:2010 06 2010 DEVELOP A REPAIR/REPLACE POLICY $621 $0 Implemented
UF0433 # 07 Y:2010 07 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,610 $0 Implemented
UF0433 # 08 Y:2010 08 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,722 $6,350 Not Implemented
UF0433 # 09 Y:2010 09 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $23,836 $4,000 Not Implemented
UF0433 # 10 Y:2010 10 2010 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $1,885 $816 Implemented
MI0192 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,080 $32,395 Implemented
MI0192 # 02 Y:2010 02 2010 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $39,832 $41,440 Not Implemented
MI0192 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $37,971 $1,020 Implemented
MI0192 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,844 $1,210 Implemented
MI0192 # 05 Y:2010 05 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $19,608 $35,500 Not Implemented
MI0192 # 06 Y:2010 06 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,417 $1,020 Implemented
MI0192 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,898 $40 Implemented
MI0192 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,732 $4,531 Not Implemented
MI0192 # 09 Y:2010 09 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,176 $9,650 Implemented
MI0191 # 01 Y:2010 01 2010 HEAT WATER WITH EXHAUST HEAT $697,331 $128,000 Not Implemented
MI0191 # 02 Y:2010 02 2010 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $228,145 $400,000 Not Implemented