Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,091
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0420 # 05 Y:1991 | 05 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $330 | $980 | Implemented |
TN0420 # 06 Y:1991 | 06 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,064 | $3,176 | Implemented |
TN0420 # 07 Y:1991 | 07 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $492 | $150 | Implemented |
TN0420 # 08 Y:1991 | 08 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $460 | $832 | Implemented |
TN0420 # 09 Y:1991 | 09 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $328 | $0 | Implemented |
TN0420 # 10 Y:1991 | 10 | 1991 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $82 | $50 | Implemented |
KU0331 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $628 | $395 | Not Implemented |
KU0331 # 02 Y:1991 | 02 | 1991 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $181 | $500 | Not Implemented |
KU0331 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $2,630 | $2,500 | Not Implemented |
KU0331 # 04 Y:1991 | 04 | 1991 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,445 | $10,200 | Not Implemented |
KU0331 # 05 Y:1991 | 05 | 1991 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,394 | $6,500 | Not Implemented |
KU0331 # 06 Y:1991 | 06 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,020 | $0 | Not Implemented |
KU0331 # 07 Y:1991 | 07 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,925 | $14,000 | Not Implemented |
KU0331 # 08 Y:1991 | 08 | 1991 | IMPROVE LUBRICATION PRACTICES | $793 | $0 | Not Implemented |
KU0332 # 01 Y:1991 | 01 | 1991 | INSTALL AUTOMATIC STACK DAMPER | $1,528 | $3,500 | Implemented |
KU0332 # 02 Y:1991 | 02 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $12,876 | $13,800 | Implemented |
KU0332 # 03 Y:1991 | 03 | 1991 | INSTALL SET-BACK TIMERS | $1,387 | $2,760 | Implemented |
KU0332 # 04 Y:1991 | 04 | 1991 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,892 | $4,400 | Implemented |
KU0332 # 05 Y:1991 | 05 | 1991 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,544 | $10,200 | Implemented |
KU0332 # 06 Y:1991 | 06 | 1991 | HEAT WATER WITH EXHAUST HEAT | $6,621 | $8,000 | Implemented |
KU0332 # 07 Y:1991 | 07 | 1991 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $904 | $600 | Implemented |
MA0201 # 01 Y:1991 | 01 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $2,084 | $1,762 | Not Implemented |
MA0201 # 03 Y:1991 | 03 | 1991 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $159,131 | $425,925 | Not Implemented |
MA0201 # 04 Y:1991 | 04 | 1991 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,784 | $500 | Not Implemented |