IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0420 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $330 $980 Implemented
TN0420 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,064 $3,176 Implemented
TN0420 # 07 Y:1991 07 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $492 $150 Implemented
TN0420 # 08 Y:1991 08 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $460 $832 Implemented
TN0420 # 09 Y:1991 09 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $328 $0 Implemented
TN0420 # 10 Y:1991 10 1991 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $82 $50 Implemented
KU0331 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $628 $395 Not Implemented
KU0331 # 02 Y:1991 02 1991 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $181 $500 Not Implemented
KU0331 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $2,630 $2,500 Not Implemented
KU0331 # 04 Y:1991 04 1991 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,445 $10,200 Not Implemented
KU0331 # 05 Y:1991 05 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,394 $6,500 Not Implemented
KU0331 # 06 Y:1991 06 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,020 $0 Not Implemented
KU0331 # 07 Y:1991 07 1991 RECOVER WASTE HEAT FROM EQUIPMENT $5,925 $14,000 Not Implemented
KU0331 # 08 Y:1991 08 1991 IMPROVE LUBRICATION PRACTICES $793 $0 Not Implemented
KU0332 # 01 Y:1991 01 1991 INSTALL AUTOMATIC STACK DAMPER $1,528 $3,500 Implemented
KU0332 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $12,876 $13,800 Implemented
KU0332 # 03 Y:1991 03 1991 INSTALL SET-BACK TIMERS $1,387 $2,760 Implemented
KU0332 # 04 Y:1991 04 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,892 $4,400 Implemented
KU0332 # 05 Y:1991 05 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,544 $10,200 Implemented
KU0332 # 06 Y:1991 06 1991 HEAT WATER WITH EXHAUST HEAT $6,621 $8,000 Implemented
KU0332 # 07 Y:1991 07 1991 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $904 $600 Implemented
MA0201 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $2,084 $1,762 Not Implemented
MA0201 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $2,084 $1,762 Not Implemented
MA0201 # 03 Y:1991 03 1991 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $159,131 $425,925 Not Implemented
MA0201 # 04 Y:1991 04 1991 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,784 $500 Not Implemented