IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0433 # 06 Y:2013 06 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $9,806 $46,860 Implemented
SF0433 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,866 $32,002 Not Implemented
SD0472 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $7,834 $3,850 Implemented
SD0472 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,979 $900 Implemented
SD0472 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $4,079 $11,220 Implemented
SD0472 # 04 Y:2013 04 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,650 $3,900 Implemented
SD0472 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $952 $2,197 Implemented
SD0472 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $568 $200 Implemented
SD0471 # 01 Y:2013 01 2013 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $629,471 $234,900 Not Implemented
SD0471 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $277,284 $353,400 Not Implemented
SD0471 # 03 Y:2013 03 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $92,696 $131,400 Not Implemented
SD0471 # 04 Y:2013 04 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $79,351 $96,000 Not Implemented
SD0471 # 05 Y:2013 05 2013 UPGRADE OBSOLETE EQUIPMENT $34,337 $110,000 Not Implemented
SD0471 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,423 $100,248 Implemented
SD0471 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,316 $500 Not Implemented
SD0471 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,126 $3,300 Implemented
SD0471 # 09 Y:2013 09 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,810 $18,500 Not Implemented
SD0471 # 10 Y:2013 10 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,926 $200 Implemented
SF0432 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,539 $0 Not Implemented
SF0432 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,729 $0 Not Implemented
SF0432 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,942 $176,082 Not Implemented
SF0432 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $70,722 $226,685 Implemented
SF0432 # 05 Y:2013 05 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,321 $22,006 Implemented
SF0432 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,285 $208,561 Implemented
SF0432 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $10,784 $5,853 Implemented