IAC logo
IAC Assessment: SF0460
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0460
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2015
Principal Product Special Alloys
NAICS 331492 - Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399 - Primary Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 25,893
Annual Production 2,500,000 Pounds
Production Hrs. Annual 6,864
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $458,549 3,567,439 kWh $0.13
Electricity Demand $217,422 10,555 kW-months/year $20.60
Electricity Fees $(-241,796) - $ -
Natural Gas $12,003 1,394 MMBtu $8.61
TOTAL ENERGY COSTS $446,178
RECOMMENDED SAVINGS* $49,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,691
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,832
Cost:
-
- - $14,832 720 -
-
kWh
$14,832
720
kW-months/year
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,167
Cost:
$624
$5,167 40,200 - - $5,167
40,200
kWh
-
-
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,080
Cost:
$4,429
$10,080 78,418 - - $10,080
78,418
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,945
Cost:
$2,541
$2,945 22,915 - - $2,945
22,915
kWh
-
-
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,462
Cost:
$9,228
$6,034 46,944 $1,428 70 $6,034
46,944
kWh
$1,428
70
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,269
Cost:
$9,057
$4,269 33,210 - - $4,269
33,210
kWh
-
-
kW-months/year
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,924
Cost:
$9,629
$3,924 30,528 - - $3,924
30,528
kWh
-
-
kW-months/year
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,062
Cost:
$3,703
$867 6,889 $195 9 $867
6,889
kWh
$195
9
kW-months/year
TOTAL RECOMMENDED Savings:
$49,741
Cost:
$39,211
$33,286 259,104 $16,455 799 $33,286
259,104
kWh
$16,455
799
kW-months/year
TOTAL IMPLEMENTED Savings:
$13,691
Cost:
$13,555
$12,068 94,033 $1,623 79 $12,068
94,033
kWh
$1,623
79
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand