Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0136 # 12 Y:1984 | 12 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $301 | $0 | Not Implemented |
KU0136 # 13 Y:1984 | 13 | 1984 | INSTALL TURBULATORS | $357 | $600 | Not Implemented |
KU0136 # 14 Y:1984 | 14 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,003 | $215 | Implemented |
KU0136 # 15 Y:1984 | 15 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,345 | $2,500 | Implemented |
KU0136 # 16 Y:1984 | 16 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $699 | $350 | Implemented |
KU0136 # 17 Y:1984 | 17 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $757 | $25 | Not Implemented |
KU0136 # 18 Y:1984 | 18 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $589 | $550 | Implemented |
KU0136 # 19 Y:1984 | 19 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $387 | $120 | Implemented |
KU0136 # 20 Y:1984 | 20 | 1984 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $219 | $400 | Implemented |
KU0136 # 21 Y:1984 | 21 | 1984 | IMPROVE LUBRICATION PRACTICES | $2,590 | $2,550 | Implemented |
KU0136 # 22 Y:1984 | 22 | 1984 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,867 | $2,640 | Not Implemented |
KU0136 # 23 Y:1984 | 23 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $795 | $0 | Implemented |
KU0136 # 24 Y:1984 | 24 | 1984 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $391 | $97 | Not Implemented |
KU0136 # 25 Y:1984 | 25 | 1984 | INSULATE BARE EQUIPMENT | $364 | $75 | Not Implemented |
KU0136 # 26 Y:1984 | 26 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $347 | $50 | Not Implemented |
KU0136 # 27 Y:1984 | 27 | 1984 | INSULATE BARE EQUIPMENT | $98 | $100 | Not Implemented |
KU0137 # 01 Y:1984 | 01 | 1984 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $4,772 | $4,500 | Not Implemented |
KU0137 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $3,839 | $0 | Implemented |
KU0137 # 03 Y:1984 | 03 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,293 | $0 | Not Implemented |
KU0137 # 04 Y:1984 | 04 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $250 | $90 | Not Implemented |
KU0137 # 05 Y:1984 | 05 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,930 | $0 | Implemented |
KU0137 # 06 Y:1984 | 06 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,472 | $2,000 | Not Implemented |
KU0137 # 07 Y:1984 | 07 | 1984 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,169 | $400 | Not Implemented |
KU0137 # 08 Y:1984 | 08 | 1984 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $1,200 | $1,670 | Not Implemented |
KU0137 # 09 Y:1984 | 09 | 1984 | INSULATE BARE EQUIPMENT | $754 | $750 | Not Implemented |