IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0188 # 01 Y:2010 01 2010 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $500,499 $0 Implemented
MI0188 # 02 Y:2010 02 2010 USE POWER DURING OFF-PEAK PERIODS $45,276 $2,000 Not Implemented
MI0188 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $42,782 $60 Implemented
MI0188 # 04 Y:2010 04 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $38,905 $0 Not Implemented
MI0188 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,420 $920 Implemented
MI0188 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,600 $1,920 Implemented
MI0188 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,952 $3,680 Not Implemented
MI0188 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $3,050 $2,904 Implemented
MI0188 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,341 $1,800 Implemented
MI0188 # 10 Y:2010 10 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,536 $1,500 Implemented
MI0187 # 01 Y:2010 01 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $24,507 $1,800 Implemented
MI0187 # 02 Y:2010 02 2010 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $17,920 $100 Not Implemented
MI0187 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,911 $0 Not Implemented
MI0187 # 04 Y:2010 04 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,158 $640 Implemented
MI0187 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,880 $4,960 Implemented
MI0187 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,598 $640 Implemented
MI0187 # 07 Y:2010 07 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,498 $0 Not Implemented
MI0187 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,438 $180 Implemented
MI0187 # 09 Y:2010 09 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,165 $360 Implemented
UF0430 # 01 Y:2010 01 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $28,959 $5,655 Implemented
UF0430 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,044 $0 Implemented
UF0430 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,531 $0 Not Implemented
UF0430 # 04 Y:2010 04 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,547 $0 Implemented
UF0430 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,211 $0 Not Implemented
UF0430 # 06 Y:2010 06 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $86,549 $4,000 Not Implemented