IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0137 # 10 Y:1984 10 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $20 Not Implemented
KU0137 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $50 Implemented
KU0137 # 13 Y:1984 13 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $212 $0 Not Implemented
KU0137 # 14 Y:1984 14 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $118 $0 Implemented
KU0137 # 15 Y:1984 15 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118 $40 Not Implemented
KU0138 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,748 $0 Implemented
KU0138 # 02 Y:1984 02 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $250 Implemented
KU0138 # 03 Y:1984 03 1984 INSTALL SET-BACK TIMERS $1,100 $0 Implemented
KU0138 # 04 Y:1984 04 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,807 $200 Implemented
KU0138 # 05 Y:1984 05 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,535 $2,500 Not Implemented
KU0138 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $314 $0 Not Implemented
KU0138 # 07 Y:1984 07 1984 IMPROVE LUBRICATION PRACTICES $4,026 $1,000 Not Implemented
KU0138 # 08 Y:1984 08 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,100 $450 Not Implemented
KU0138 # 10 Y:1984 10 1984 INSTALL AUTOMATIC STACK DAMPER $2,518 $1,600 Not Implemented
KU0138 # 11 Y:1984 11 1984 INSTALL TIMERS AND/OR THERMOSTATS $661 $0 Implemented
KU0138 # 12 Y:1984 12 1984 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $884 $120 Implemented
KU0138 # 13 Y:1984 13 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $112 $0 Not Implemented
KU0131 # 01 Y:1984 01 1984 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $15,513 $17,900 Not Implemented
KU0131 # 02 Y:1984 02 1984 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,554 $18,500 Not Implemented
KU0131 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,281 $200 Implemented
KU0131 # 04 Y:1984 04 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,270 $235 Not Implemented
KU0131 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,310 $170 Implemented
KU0131 # 06 Y:1984 06 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,902 $30 Not Implemented
KU0131 # 07 Y:1984 07 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $485 $350 Implemented
KU0131 # 08 Y:1984 08 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $975 $1,000 Not Implemented