IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,263

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0038 # 04 Y:1985 04 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $10,144 $1,900 Implemented
LT0038 # 05 Y:1985 05 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,399 $1,930 Not Implemented
LT0038 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,163 $299 Not Implemented
LT0040 # 01 Y:1985 01 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,590 $4,500 Not Implemented
LT0040 # 02 Y:1985 02 1985 COVER OPEN TANKS $1,600 $216 Not Implemented
LT0040 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,890 $9,540 Not Implemented
LT0040 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,625 $450 Not Implemented
LT0041 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $100 Implemented
LT0041 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,397 $1,000 Not Implemented
LT0041 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,008 $450 Implemented
LT0041 # 04 Y:1985 04 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,080 $264 Implemented
LT0041 # 05 Y:1985 05 1985 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $1,419 $2,500 Not Implemented
LT0041 # 06 Y:1985 06 1985 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $400 $990 Implemented
LT0041 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,040 $859 Implemented
LT0041 # 08 Y:1985 08 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $650 $42 Implemented
LT0042 # 01 Y:1985 01 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $817 $139 Implemented
LT0042 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,140 $167 Implemented
LT0042 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $62,300 $31,000 Implemented
LT0042 # 04 Y:1985 04 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,590 $2,076 Implemented
LT0045 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $770 $0 Implemented
LT0045 # 02 Y:1985 02 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $217 $191 Implemented
LT0045 # 03 Y:1985 03 1985 COVER OPEN TANKS $44,800 $14,000 Not Implemented
LT0045 # 04 Y:1985 04 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,671 $6,000 Implemented
LT0045 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $595 $75 Implemented
LT0046 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,262 $0 Implemented