IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0340 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $2,464 Implemented
MA0340 # 06 Y:1995 06 1995 REDUCE VENTILATION AIR $1,190 $3,320 Implemented
MA0340 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $753 $0 Implemented
MA0340 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $612 $330 Implemented
MA0340 # 09 Y:1995 09 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $558 $127 Not Implemented
MA0340 # 10 Y:1995 10 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $356 $570 Implemented
SD0124 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,576 $4,090 Not Implemented
SD0124 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,134 $2,800 Not Implemented
SD0124 # 03 Y:1995 03 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $66,089 $22,000 Not Implemented
SD0124 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,030 $55,699 Not Implemented
SD0124 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $34,416 $30,660 Not Implemented
SD0124 # 06 Y:1995 06 1995 USE CYLINDRICAL TANKS WITH HEIGHT TO DIAMETER RATIOS CLOSE TO ONE TO REDUCE WETTED SURFACE $1,558 $900 Not Implemented
SD0124 # 07 Y:1995 07 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $1,415 $3,000 Not Implemented
SD0124 # 08 Y:1995 08 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,856 $0 Not Implemented
OR0238 # 01 Y:1995 01 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,668 $0 Implemented
OR0238 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $38,868 $9,488 Implemented
OR0238 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $407 $227 Implemented
OR0238 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $949 $1,180 Implemented
OR0238 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $3,672 $6,000 Not Implemented
OR0238 # 06 Y:1995 06 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,402 $6,389 Implemented
OR0238 # 07 Y:1995 07 1995 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $9,760 $0 Implemented
OR0238 # 08 Y:1995 08 1995 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $38,994 $3,566 Not Implemented
SF0061 # 01 Y:1995 01 1995 INSTALL OCCUPANCY SENSORS $1,935 $360 Not Implemented
SF0061 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $129 $170 Implemented
SF0061 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $347 $1,570 Not Implemented