IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0135 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $9,698 $1,016 Implemented
LL0135 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $8,850 $1,326 Implemented
LL0135 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $8,388 $2,540 Implemented
LL0135 # 09 Y:2002 09 2002 USE PHOTOCELL CONTROLS $5,775 $960 Not Implemented
LL0135 # 10 Y:2002 10 2002 INSULATE BARE EQUIPMENT $3,301 $957 Implemented
LL0135 # 11 Y:2002 11 2002 USE PHOTOCELL CONTROLS $2,798 $369 Not Implemented
LL0135 # 12 Y:2002 12 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,154 $300 Implemented
LL0135 # 13 Y:2002 13 2002 INSULATE BARE EQUIPMENT $154 $102 Implemented
AM0416 # 01 Y:2002 01 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $64,320 $61,000 Implemented
AM0416 # 02 Y:2002 02 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,340 $0 Implemented
AM0416 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,960 $400 Implemented
AM0416 # 04 Y:2002 04 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,810 $210 Implemented
AM0416 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,550 $1,000 Implemented
AM0416 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $860 $410 Implemented
AM0416 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $565 $250 Implemented
AM0416 # 08 Y:2002 08 2002 PAY BILLS ON TIME TO AVOID LATE FEES $310 $0 Implemented
AS0321 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,476 $2,819 Not Implemented
AS0321 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,990 $2,700 Implemented
AS0321 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,666 $100 Implemented
AS0321 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $16,063 $4,370 Implemented
AS0321 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,394 $323 Implemented
GT0735 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $55,394 $0 Not Implemented
GT0735 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $388 $250 Implemented
GT0735 # 03 Y:2002 03 2002 USE PHOTOCELL CONTROLS $3,933 $2,675 Not Implemented
GT0735 # 04 Y:2002 04 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $21,246 $9,000 Not Implemented