Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,703
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0899 # 02 Y:2014 | 02 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $388 | $0 | Implemented |
UD0899 # 03 Y:2014 | 03 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $85 | $0 | Not Implemented |
UD0899 # 04 Y:2014 | 04 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,795 | $4,550 | Not Implemented |
UD0899 # 05 Y:2014 | 05 | 2014 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $2,075 | $0 | Implemented |
UD0899 # 06 Y:2014 | 06 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,303 | $0 | Implemented |
UD0899 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,350 | $7,126 | Not Implemented |
UD0899 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $969 | $2,127 | Implemented |
UD0899 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,254 | $15,180 | Not Implemented |
UD0899 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,255 | $5,850 | Not Implemented |
UD0899 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,635 | $3,920 | Not Implemented |
MZ0137 # 01 Y:2014 | 01 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,036 | $0 | Not Implemented |
MZ0137 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $1,989 | $1,920 | Implemented |
MZ0137 # 03 Y:2014 | 03 | 2014 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $856 | $2,050 | Implemented |
MZ0137 # 04 Y:2014 | 04 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,610 | $0 | Implemented |
MZ0137 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $805 | $1,475 | Implemented |
MZ0137 # 06 Y:2014 | 06 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $8,378 | $0 | Implemented |
MZ0137 # 07 Y:2014 | 07 | 2014 | AIR CONDITION ONLY SPACE NECESSARY | $4,215 | $0 | Not Implemented |
MZ0137 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,678 | $7,200 | Not Implemented |
WV0481 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,697 | $36,851 | Not Implemented |
WV0481 # 02 Y:2014 | 02 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,611 | $72,000 | Not Implemented |
WV0481 # 03 Y:2014 | 03 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $10,571 | $1,000 | Implemented |
WV0481 # 04 Y:2014 | 04 | 2014 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $5,404 | $0 | Not Implemented |
WV0481 # 05 Y:2014 | 05 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $3,317 | $381 | Implemented |
WV0481 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $3,285 | $4,251 | Implemented |
WV0481 # 07 Y:2014 | 07 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,147 | $2,480 | Not Implemented |