Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,263
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT0025 # 03 Y:1985 | 03 | 1985 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $6,134 | $500 | Implemented |
LT0025 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $531 | $400 | Implemented |
LT0030 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,893 | $4,000 | Implemented |
LT0030 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,950 | $0 | Not Implemented |
LT0030 # 03 Y:1985 | 03 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,165 | $1,500 | Not Implemented |
LT0030 # 04 Y:1985 | 04 | 1985 | COVER OPEN TANKS | $11,697 | $1,512 | Not Implemented |
LT0030 # 05 Y:1985 | 05 | 1985 | INSULATE BARE EQUIPMENT | $5,358 | $8,532 | Not Implemented |
LT0031 # 01 Y:1985 | 01 | 1985 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,755 | $1,167 | Implemented |
LT0031 # 02 Y:1985 | 02 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $821 | $88 | Implemented |
LT0031 # 03 Y:1985 | 03 | 1985 | USE OPTIMUM TEMPERATURE | $5,175 | $15,000 | Implemented |
LT0022 # 01 Y:1985 | 01 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,180 | $450 | Implemented |
LT0022 # 02 Y:1985 | 02 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,361 | $11,640 | Not Implemented |
LT0022 # 03 Y:1985 | 03 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,825 | $7,865 | Implemented |
LT0023 # 01 Y:1985 | 01 | 1985 | COVER OPEN TANKS | $4,258 | $458 | Not Implemented |
LT0023 # 02 Y:1985 | 02 | 1985 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $18,120 | $45,000 | Implemented |
LT0023 # 03 Y:1985 | 03 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,435 | $624 | Implemented |
LT0023 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,636 | $762 | Implemented |
LT0026 # 01 Y:1985 | 01 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,318 | $300 | Implemented |
LT0026 # 02 Y:1985 | 02 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,870 | $11,300 | Implemented |
LT0026 # 03 Y:1985 | 03 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,340 | $405 | Implemented |
LT0026 # 04 Y:1985 | 04 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,384 | $138 | Implemented |
LT0026 # 05 Y:1985 | 05 | 1985 | REPAIR AND ELIMINATE STEAM LEAKS | $2,460 | $15 | Implemented |
LT0026 # 06 Y:1985 | 06 | 1985 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,239 | $2,800 | Implemented |
LT0026 # 07 Y:1985 | 07 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $4,208 | $300 | Implemented |
LT0026 # 08 Y:1985 | 08 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,510 | $3,337 | Not Implemented |