IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0174 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $1,642 $1,000 Not Implemented
WI0174 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,315 $0 Not Implemented
WI0174 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,100 $1,559 Not Implemented
WI0174 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $914 $0 Not Implemented
WI0174 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $908 $960 Not Implemented
WI0174 # 09 Y:1993 09 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $787 $500 Not Implemented
TN0490 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $8,220 $1,081 Not Implemented
TN0490 # 02 Y:1993 02 1993 ISOLATE HOT OR COLD EQUIPMENT $2,687 $7,200 Implemented
TN0490 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,097 $490 Implemented
TN0490 # 04 Y:1993 04 1993 INSTALL TIMERS AND/OR THERMOSTATS $746 $460 Implemented
TN0490 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $408 $277 Not Implemented
KU0396 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $15,571 $21,400 Not Implemented
KU0396 # 02 Y:1993 02 1993 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $6,812 $6,925 Implemented
KU0396 # 03 Y:1993 03 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,811 $10,000 Not Implemented
KU0396 # 04 Y:1993 04 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,274 $10,000 Not Implemented
KU0396 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,545 $1,172 Not Implemented
KU0396 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,065 $216 Implemented
KU0396 # 08 Y:1993 08 1993 RECOVER WASTE HEAT FROM EQUIPMENT $422 $668 Not Implemented
KU0396 # 09 Y:1993 09 1993 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $252 $0 Implemented
WI0175 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $10,455 $8,000 Not Implemented
WI0175 # 02 Y:1993 02 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,259 $0 Implemented
WI0175 # 03 Y:1993 03 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,118 $675 Not Implemented
WI0175 # 04 Y:1993 04 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,672 $4,650 Implemented
WI0175 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,329 $0 Not Implemented
WI0175 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $972 $800 Not Implemented