IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,706

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0558 # 07 Y:2024 07 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $474 $2,500 n/a
LS0224 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,796 $25 n/a
LS0224 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,962 $75 n/a
LS0224 # 03 Y:2024 03 2024 RECOVER WASTE HEAT FROM EQUIPMENT $17,495 $20,000 n/a
LS0224 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $1,413 n/a
LS0224 # 05 Y:2024 05 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $175,678 $600,000 n/a
LS0224 # 06 Y:2024 06 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,486 $113,400 n/a
LS0224 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $38,021 $514,800 n/a
UU0243 # 01 Y:2024 01 2024 AIR CONDITION ONLY SPACE NECESSARY $26,330 $19,500 Implemented
UU0243 # 02 Y:2024 02 2024 USE POWER DURING OFF-PEAK PERIODS $15,800 $13,000 Not Implemented
UU0243 # 03 Y:2024 03 2024 COVER OPEN TANKS $9,190 $7,340 Implemented
UU0243 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,631 $22,338 Not Implemented
UU0243 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,244 $14,145 Not Implemented
UU0243 # 06 Y:2024 06 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,800 $6,300 Implemented
UU0243 # 07 Y:2024 07 2024 OPTIMIZE PLANT POWER FACTOR $1,900 $6,000 Implemented
CW0130 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,562 $17,397 n/a
CW0130 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $4,196 $2,050 n/a
CW0130 # 03 Y:2024 03 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,298 $8,391 n/a
CW0130 # 04 Y:2024 04 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $202 $424 n/a
CW0130 # 05 Y:2024 05 2024 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $7,210 $13,000 n/a
CW0130 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $1,786 $6,750 n/a
IC0296 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $5,921 $1,066 n/a
IC0296 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,196 $12,921 n/a
IC0296 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,777 $8,406 n/a
IC0296 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,324 $400 n/a