IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,263

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0017 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,540 $150 Implemented
LT0017 # 04 Y:1985 04 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,960 $13,000 Implemented
LT0017 # 05 Y:1985 05 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $569 $600 Not Implemented
LT0017 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,190 $10,000 Implemented
LT0018 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,397 $59 Implemented
LT0018 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $46 $75 Implemented
LT0018 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $456 $237 Not Implemented
LT0018 # 04 Y:1985 04 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $458 $81 Implemented
LT0018 # 05 Y:1985 05 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $273 $60 Not Implemented
LT0019 # 01 Y:1985 01 1985 DIRECT WARMEST AIR TO COMBUSTION INTAKE $277 $8 Not Implemented
LT0019 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $482 $444 Not Implemented
LT0020 # 01 Y:1985 01 1985 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $29,200 $18,740 Implemented
LT0020 # 02 Y:1985 02 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,380 $12,500 Not Implemented
LT0020 # 03 Y:1985 03 1985 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $4,460 $1,150 Implemented
LT0009 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,320 $1,750 Implemented
LT0009 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,020 $0 Implemented
LT0009 # 03 Y:1984 03 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,600 $4,648 Not Implemented
LT0012 # 01 Y:1984 01 1984 COVER OPEN TANKS $2,600 $691 Not Implemented
LT0012 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $2,100 $2,958 Implemented
LT0012 # 03 Y:1984 03 1984 COVER OPEN TANKS $142 $36 Not Implemented
LT0012 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $102 $160 Implemented
LT0012 # 05 Y:1984 05 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,638 $186 Implemented
LT0012 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $1,400 Implemented
LT0013 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,540 $0 Implemented
LT0013 # 02 Y:1984 02 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $425 $561 Implemented