IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0223 # 04 Y:2023 04 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $994 $4,800 Implemented
DL0223 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $490,980 $10,000 Not Implemented
DL0223 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,906 $7,955 Not Implemented
IC0278 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $147,541 $1,271,712 Not Implemented
IC0278 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $5,879 $15,415 Not Implemented
IC0278 # 03 Y:2023 03 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $175,901 $710,922 Not Implemented
IC0278 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,040 $600 Implemented
CI0012 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,094 $83,743 n/a
CI0012 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $48,677 $330,808 n/a
CI0012 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $37,006 $28,350 n/a
CI0012 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $24,550 $9,000 n/a
CI0012 # 05 Y:2023 05 2023 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $13,935 $8,000 n/a
CI0012 # 06 Y:2023 06 2023 SHUT OFF PILOTS IN STANDBY EQUIPMENT $9,977 $1,040 n/a
CI0012 # 07 Y:2023 07 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,614 $8,200 n/a
CI0012 # 08 Y:2023 08 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,166 $2,400 n/a
MU0024 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $14,863 $294,000 Implemented
MU0024 # 02 Y:2023 02 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,030 $122,000 Not Implemented
MU0024 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,238 $4,250 Implemented
MU0024 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $247 $260 Not Implemented
MU0024 # 05 Y:2023 05 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $203 $76 Implemented
LT8376 # 01 Y:2023 01 2023 USE RADIANT HEATER FOR SPOT HEATING $7,532 $8,500 n/a
LT8376 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $210 n/a
LT8376 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,881 $31,854 n/a
SD0634 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $942 $3,568 Implemented
SD0634 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,518 $700 Implemented