IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,636

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0147 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,366 $72,811 Not Implemented
UA0147 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,680 $1,096 Not Implemented
UA0147 # 03 Y:2015 03 2015 USE PHOTOCELL CONTROLS $46 $117 Implemented
UA0147 # 04 Y:2015 04 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,593 $1,875 Not Implemented
UA0147 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $960 $1,930 Implemented
UA0147 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $320 $100 Not Implemented
UA0147 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $539 $2,535 Not Implemented
UA0147 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $278 $225 Implemented
UA0146 # 01 Y:2015 01 2015 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $47,379 $42,596 Not Implemented
UA0146 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,612 $800 Implemented
UA0146 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,141 $27,750 Implemented
UA0146 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,985 $2,995 Not Implemented
UA0146 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,170 $20,711 Not Implemented
UA0146 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $1,518 $1,802 Not Implemented
UA0146 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,583 $80 Implemented
UA0137 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $26,242 $0 Implemented
UA0137 # 02 Y:2015 02 2015 INSTALL TIMERS AND/OR THERMOSTATS $234 $0 Implemented
UA0137 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,499 $4,495 Implemented
UA0137 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $15,099 $2,441 Implemented
UA0137 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,122 $800 Implemented
UA0137 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $136 $57 Implemented
AM0668 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $48,700 $3,340 Not Implemented
AM0668 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,250 $2,500 Implemented
AM0668 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,840 $33,524 Implemented
AM0668 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,820 $9 Not Implemented