IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0018 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,361 $4,553 Not Implemented
NT0018 # 02 Y:2023 02 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $35,653 $1,258 Not Implemented
NT0018 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,450 $1,311 Not Implemented
NT0018 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,420 $11,457 Implemented
NT0018 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,528 $0 Not Implemented
NT0018 # 06 Y:2023 06 2023 OPTIMIZE PLANT POWER FACTOR $8,460 $6,082 Not Implemented
NT0018 # 07 Y:2023 07 2023 PURCHASE EQUIPMENT INSTEAD OF LEASING $45,600 $27,500 Not Implemented
NT0018 # 08 Y:2023 08 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,056 $0 Not Implemented
NT0018 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,092 $5,443 Not Implemented
NT0017 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $50,287 $1,258 Not Implemented
NT0017 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $7,255 $2,016 Not Implemented
NT0017 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $262 $0 Implemented
NT0017 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,009 $0 Implemented
NT0017 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $1,567 $1,311 Not Implemented
NT0017 # 06 Y:2023 06 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $2,798 $3,380 Not Implemented
NT0017 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $734 $2,396 Not Implemented
AM0890 # 01 Y:2023 01 2023 USE OPTIMUM TEMPERATURE $12,180 $0 Not Implemented
AM0890 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,660 $2,690 Implemented
AM0890 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,090 $1,000 Implemented
AM0890 # 04 Y:2023 04 2023 PAY UTILITY BILLS ON TIME $2,933 $0 Not Implemented
AM0890 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,310 $0 Not Implemented
AM0890 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $18 Implemented
AM0890 # 07 Y:2023 07 2023 USE SYNTHETIC LUBRICANT $350 $200 Not Implemented
AM0890 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $240 $480 Implemented
AM0890 # 09 Y:2023 09 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $89 $38 Not Implemented