Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0225 # 02 Y:1999 | 02 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,812 | $3,000 | Not Implemented |
SD0225 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,087 | $0 | Implemented |
SD0225 # 04 Y:1999 | 04 | 1999 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $704 | $400 | Implemented |
SD0225 # 05 Y:1999 | 05 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,845 | $240 | Implemented |
SD0225 # 06 Y:1999 | 06 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,820 | $0 | Implemented |
ME0267 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,913 | $26,510 | Implemented |
ME0267 # 02 Y:1999 | 02 | 1999 | USE OPTIMUM THICKNESS INSULATION | $19,127 | $1,962 | Not Implemented |
ME0267 # 03 Y:1999 | 03 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,533 | $2,511 | Implemented |
ME0267 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,078 | $3,870 | Implemented |
ME0267 # 05 Y:1999 | 05 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,496 | $3,800 | Implemented |
ME0267 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,540 | $380 | Not Implemented |
ME0267 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,850 | $500 | Implemented |
ME0267 # 08 Y:1999 | 08 | 1999 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $1,990 | $3,900 | Implemented |
ME0267 # 09 Y:1999 | 09 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $836 | $900 | Not Implemented |
ME0267 # 10 Y:1999 | 10 | 1999 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $249 | $900 | Not Implemented |
IA0220 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,950 | $0 | Implemented |
IA0220 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,697 | $500 | Implemented |
IA0220 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,645 | $50 | Not Implemented |
IA0220 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,597 | $232 | Implemented |
IA0220 # 05 Y:1999 | 05 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,802 | $0 | Not Implemented |
MA0442 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $186,395 | $900,000 | Not Implemented |
MA0442 # 02 Y:1999 | 02 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $73,450 | $125,600 | Not Implemented |
MA0442 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $19,396 | $38,500 | Implemented |
MA0442 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,380 | $11,544 | Implemented |
MA0442 # 05 Y:1999 | 05 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $964 | $2,575 | Implemented |