IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,250

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0891 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $525 $390 Not Implemented
AM0891 # 06 Y:2024 06 2024 USE SYNTHETIC LUBRICANT $340 $980 Not Implemented
AM0891 # 07 Y:2024 07 2024 USE PHOTOCELL CONTROLS $47 $165 Implemented
AM0895 # 01 Y:2024 01 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,705 $20,000 n/a
AM0895 # 02 Y:2024 02 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $2,191 $72,800 n/a
AM0895 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $11,762 $218,737 n/a
LT8382 # 01 Y:2024 01 2024 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,178 $61,016 n/a
LT8382 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,368 $8,172 n/a
LT8382 # 03 Y:2024 03 2024 USE PHOTOCELL CONTROLS $731 $328 n/a
LT8382 # 04 Y:2024 04 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,755 $8,100 n/a
LT8382 # 05 Y:2024 05 2024 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $2,042 $4,483 n/a
LT8382 # 06 Y:2024 06 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,120 $600 n/a
LT8382 # 07 Y:2024 07 2024 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $8,567 $56,250 n/a
NT0019 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $60,556 $294,320 Not Implemented
NT0019 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,486 $33,471 Not Implemented
NT0019 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $36,036 $9,814 Not Implemented
NT0019 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $12,574 $0 Not Implemented
NT0019 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,487 $4,553 Not Implemented
DL0230 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $13,779 $15,504 n/a
DL0230 # 02 Y:2024 02 2024 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $44,058 $22,437 n/a
DL0230 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $100,915 $74,000 n/a
DL0230 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,146 $2,040 n/a
DL0230 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,418 $0 n/a
DL0230 # 06 Y:2024 06 2024 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $15,141 $10,000 n/a
DL0230 # 07 Y:2024 07 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,919 $2,200 n/a