IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1916 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $105 $50 Not Implemented
LS1916 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,588 $810 Not Implemented
LS1916 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $129 $104 Not Implemented
LS1916 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,620 $7,104 Not Implemented
LS1916 # 08 Y:2019 08 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $110 $125 Not Implemented
LS1916 # 09 Y:2019 09 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $369 $500 Not Implemented
WV0587 # 01 Y:2019 01 2019 UPGRADE CONTROLS ON COMPRESSORS $77,971 $40,873 Not Implemented
WV0587 # 02 Y:2019 02 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $67,428 $29,350 Not Implemented
WV0587 # 03 Y:2019 03 2019 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $32,679 $11,750 Not Implemented
WV0587 # 04 Y:2019 04 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,887 $4,500 Implemented
WV0587 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,112 $300 Implemented
WV0587 # 06 Y:2019 06 2019 MINIMIZE WATER USAGE $7,337 $6,300 Not Implemented
WV0587 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $5,261 $650 Implemented
WV0587 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,563 $600 Implemented
WV0587 # 09 Y:2019 09 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,481 $0 Not Implemented
WV0587 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,319 $8,500 Not Implemented
WV0587 # 11 Y:2019 11 2019 INSULATE BARE EQUIPMENT $2,257 $2,624 Implemented
WV0587 # 12 Y:2019 12 2019 INSTALL OCCUPANCY SENSORS $1,787 $1,750 Implemented
WV0587 # 13 Y:2019 13 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,138 $6,500 Not Implemented
GT0934 # 01 Y:2019 01 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,153 $250 Implemented
GT0934 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $2,334 $1,238 Implemented
GT0934 # 03 Y:2019 03 2019 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $9,210 $19,899 Not Implemented
GT0934 # 04 Y:2019 04 2019 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $305,911 $903,775 Not Implemented
GT0934 # 05 Y:2019 05 2019 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $445 $2,770 Implemented
GT0934 # 06 Y:2019 06 2019 USE SOLAR HEAT FOR HEAT $37,938 $246,597 Implemented