IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0363 # 01 Y:1992 01 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,829 $0 Implemented
KU0363 # 02 Y:1992 02 1992 REDESIGN PROCESS $1,590 $2,500 Not Implemented
KU0363 # 03 Y:1992 03 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,576 $0 Not Implemented
KU0363 # 04 Y:1992 04 1992 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $207 $0 Implemented
KU0363 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $850 Not Implemented
KU0363 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $181 $200 Implemented
KU0364 # 01 Y:1992 01 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $24,869 $10,000 Not Implemented
KU0364 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,102 $2,000 Implemented
KU0364 # 03 Y:1992 03 1992 OPTIMIZE PLANT POWER FACTOR $4,116 $2,408 Implemented
KU0364 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $568 $400 Not Implemented
KU0364 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $484 $771 Implemented
KU0364 # 06 Y:1992 06 1992 KEEP BOILER TUBES CLEAN $561 $135 Implemented
KU0364 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $0 Not Implemented
KU0364 # 08 Y:1992 08 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $599 $150 Not Implemented
KU0364 # 09 Y:1992 09 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,372 $3,990 Not Implemented
MA0235 # 01 Y:1992 01 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $94,715 $181,225 Not Implemented
MA0235 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,460 $14,275 Not Implemented
MA0235 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,525 $24,600 Implemented
MA0235 # 04 Y:1992 04 1992 REPAIR AND ELIMINATE STEAM LEAKS $7,975 $165 Implemented
MA0235 # 05 Y:1992 05 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,141 $584 Not Implemented
MO0050 # 01 Y:1992 01 1992 ISOLATE HOT OR COLD EQUIPMENT $8,525 $1,400 Implemented
MO0050 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $959 $1,700 Implemented
MO0050 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,886 $0 Not Implemented
MO0050 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $885 $7,000 Implemented
MO0050 # 05 Y:1992 05 1992 INSULATE BARE EQUIPMENT $3,204 $8,800 Implemented