IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,529

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0535 # 02 Y:1994 02 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,230 $0 Not Implemented
GT0535 # 03 Y:1994 03 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,505 $22,420 Not Implemented
GT0535 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $940 Implemented
GT0534 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,090 $2,770 n/a
GT0534 # 02 Y:1994 02 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,040 $0 n/a
GT0534 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,970 $3,700 n/a
GT0534 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $580 $5,280 n/a
GT0534 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $190 $260 n/a
GT0533 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $3,740 $17,700 Not Implemented
GT0533 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,100 $11,640 Not Implemented
GT0533 # 03 Y:1994 03 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,610 $16,875 Not Implemented
GT0533 # 04 Y:1994 04 1994 REPAIR AND ELIMINATE STEAM LEAKS $1,920 $300 Not Implemented
GT0533 # 05 Y:1994 05 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $510 $600 Not Implemented
GT0533 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $3,750 Not Implemented
GT0538 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,230 $2,500 Implemented
GT0538 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,850 $3,000 Not Implemented
GT0538 # 03 Y:1994 03 1994 USE SYNTHETIC LUBRICANT $14,510 $0 Not Implemented
GT0538 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,870 $3,250 Not Implemented
GT0538 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,740 $160,000 Not Implemented
GT0538 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,570 $18,880 Implemented
GT0538 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $4,860 Implemented
GT0538 # 08 Y:1994 08 1994 AIR CONDITION ONLY SPACE NECESSARY $22,300 $1,890 Not Implemented
GT0538 # 09 Y:1994 09 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $228,100 $770,000 Not Implemented
GT0529 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,460 $34,270 Implemented
GT0529 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,780 $9,250 Not Implemented