IAC logo
IAC Assessment: GT0549
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0549
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1995
Principal Product Programmable Logic Controllers
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 345
Plant Area (Sq.Ft.) 50,000
Annual Production 800,000 Pieces
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $411,290 7,199,590 kWh $0.06
Natural Gas $9,700 1,582 MMBtu $6.13
TOTAL ENERGY COSTS $420,990
RECOMMENDED SAVINGS* $77,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,350
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,100
Cost:
$50,690
$21,100 286,342 - - $21,100
286,342
kWh
-
-
MMBtu
02: 2.7122 DISCONNECT BALLASTS Savings:
$11,120
Cost:
$2,895
$11,120 221,278 - - $11,120
221,278
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,430
Cost:
$400
$1,430 28,429 - - $1,430
28,429
kWh
-
-
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$19,500
Cost:
$24,000
$19,500 457,210 - - $19,500
457,210
kWh
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,520
Cost:
$3,000
- - $4,520 737 -
-
kWh
$4,520
737
MMBtu
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$18,200
Cost:
$168,000
$18,200 345,838 - - $18,200
345,838
kWh
-
-
MMBtu
07: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$1,830
Cost:
$4,000
$1,830 - - - $1,830
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$77,700
Cost:
$252,985
$73,180 1,339,097 $4,520 737 $73,180
1,339,097
kWh
$4,520
737
MMBtu
TOTAL IMPLEMENTED Savings:
$71,350
Cost:
$245,985
$71,350 1,339,097 - - $71,350
1,339,097
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas