IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0466 # 02 Y:1995 02 1995 REPLACE BOILER $7,884 $28,000 Not Implemented
OK0466 # 03 Y:1995 03 1995 UPGRADE CONTROLS ON COMPRESSORS $2,331 $1,800 Not Implemented
OK0466 # 04 Y:1995 04 1995 USE PHOTOCELL CONTROLS $2,034 $2,240 Implemented
OK0466 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $446 $1,178 Implemented
OK0467 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,046 $2,349 Implemented
OK0467 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $782 $910 Not Implemented
OK0467 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,563 $32,566 Implemented
OK0467 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,548 $0 Implemented
OK0465 # 01 Y:1995 01 1995 UPGRADE CONTROLS ON COMPRESSORS $11,014 $10,115 Implemented
OK0465 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,695 $90 Implemented
OK0465 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,707 $6,141 Not Implemented
OK0465 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,033 $0 Not Implemented
OK0465 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $897 $936 Implemented
OK0465 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $726 $870 Implemented
OK0462 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,492 $13,000 Not Implemented
OK0462 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,024 $60 Implemented
OK0462 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $861 $1,512 Implemented
OK0462 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $789 $2,220 Not Implemented
OK0461 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,455 $19,000 Not Implemented
OK0461 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,046 $120 Implemented
OK0461 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $993 $437 Implemented
OK0461 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $257 $0 Not Implemented
OK0461 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $127 $201 Not Implemented
OK0464 # 01 Y:1995 01 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $37,301 $2,000 Implemented
OK0464 # 02 Y:1995 02 1995 USE PUMPS AND PIPING TO DECREASE THE FREQUENCY OF SPILLAGE DURING MATERIAL TRANSFER $3,872 $7,422 Implemented