Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0836 # 07 Y:2011 | 07 | 2011 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $12,875 | $15,000 | Not Implemented |
UD0836 # 08 Y:2011 | 08 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,572 | $99,100 | Not Implemented |
UD0836 # 09 Y:2011 | 09 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,293 | $18,000 | Not Implemented |
UD0836 # 10 Y:2011 | 10 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,389 | $10,000 | Not Implemented |
UD0835 # 01 Y:2011 | 01 | 2011 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,722 | $145,390 | Not Implemented |
UD0835 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $305 | $25 | Implemented |
UD0835 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,411 | $200 | Not Implemented |
UD0835 # 04 Y:2011 | 04 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,430 | $11,500 | Not Implemented |
UD0835 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,571 | $40,131 | Not Implemented |
UD0835 # 06 Y:2011 | 06 | 2011 | REPLACE BOILER | $15,607 | $52,190 | Not Implemented |
UD0835 # 07 Y:2011 | 07 | 2011 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $15,451 | $12,000 | Not Implemented |
UD0835 # 08 Y:2011 | 08 | 2011 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $13,470 | $14,800 | Not Implemented |
UD0834 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $688 | $3,315 | Not Implemented |
UD0834 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $251 | $860 | Not Implemented |
UD0834 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197 | $665 | Implemented |
UD0834 # 04 Y:2011 | 04 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $408 | $25 | Implemented |
UD0834 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $211 | $25 | Implemented |
UD0834 # 06 Y:2011 | 06 | 2011 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,027 | $6,500 | Not Implemented |
UD0834 # 07 Y:2011 | 07 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $6,582 | $2,349 | Implemented |
UD0833 # 01 Y:2011 | 01 | 2011 | INSTALL OCCUPANCY SENSORS | $2,272 | $300 | Implemented |
UD0833 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,467 | $25 | Implemented |
UD0833 # 03 Y:2011 | 03 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $24,064 | $1,075 | Not Implemented |
UD0833 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,026 | $500 | Not Implemented |
UD0833 # 05 Y:2011 | 05 | 2011 | UPGRADE OBSOLETE EQUIPMENT | $3,710 | $12,661 | Not Implemented |
UD0833 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,343 | $500 | Implemented |