IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0106 # 06 Y:1995 06 1995 KEEP BOILER TUBES CLEAN $1,072 $1,000 Implemented
HO0106 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,991 $3,000 Not Implemented
HO0106 # 08 Y:1995 08 1995 COVER OPEN TANKS $5,223 $212 Implemented
KG0026 # 01 Y:1995 01 1995 HEAT WATER WITH EXHAUST HEAT $14,224 $2,500 Implemented
KG0026 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,694 $0 Implemented
KG0026 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,123 $1,850 Implemented
KG0026 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,076 $183 Implemented
KG0026 # 05 Y:1995 05 1995 INSTALL TIMERS AND/OR THERMOSTATS $823 $300 Implemented
KG0026 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $375 Implemented
KG0026 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $494 $20 Implemented
OK0468 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,638 $7,000 Implemented
OK0468 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,196 $8,775 Not Implemented
OK0468 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $964 $2,998 Implemented
OK0468 # 04 Y:1995 04 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $1,016 $50 Not Implemented
OK0468 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $290 $1,186 Not Implemented
OK0468 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61 $171 Not Implemented
OK0468 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18 $20 Implemented
OD0033 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $752 $800 Implemented
OD0033 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $823 $2,967 Implemented
OD0033 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $261 $747 Not Implemented
OD0033 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,994 $6,431 Not Implemented
OD0033 # 01 Y:1995 01 1995 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $12,595 $4,616 Not Implemented
TN0549 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $890 $1,520 Implemented
TN0549 # 02 Y:1995 02 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,249 $4,640 Not Implemented
TN0549 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,374 $770 Not Implemented