IAC logo
IAC Assessment: HO0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1995
Principal Product Metal Stampings
NAICS n/a
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 78,000
Annual Production 100,000,000 Pieces
Production Hrs. Annual 2,626
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,252 863,130 kWh $0.17
Natural Gas $51,439 5,595 MMBtu $9.19
TOTAL ENERGY COSTS $197,691
RECOMMENDED SAVINGS* $18,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,693
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$810
Cost:
$1,088
$810 4,982 - - $810
4,982
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$411
Cost:
$713
$411 2,638 - - $411
2,638
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$358
Cost:
$1,006
$358 2,052 - - $358
2,052
kWh
-
-
MMBtu
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,177
Cost:
-
$2,177 9,672 - - $2,177
9,672
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$242
Cost:
$126
- - $242 26 -
-
kWh
$242
26
MMBtu
06: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$1,072
Cost:
$1,000
- - $1,072 116 -
-
kWh
$1,072
116
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,991
Cost:
$3,000
$10,462 63,013 $(-2,471) (-269) $10,462
63,013
kWh
$(-2,471)
(-269)
MMBtu
08: 2.2514 COVER OPEN TANKS Savings:
$5,223
Cost:
$212
$5,223 31,653 - - $5,223
31,653
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,284
Cost:
$7,145
$19,441 114,010 $(-1,157) (-127) $19,441
114,010
kWh
$(-1,157)
(-127)
MMBtu
TOTAL IMPLEMENTED Savings:
$9,693
Cost:
$3,013
$8,621 48,945 $1,072 116 $8,621
48,945
kWh
$1,072
116
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas