IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1502 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,868 $0 Implemented
UK1502 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,281 $1,900 Not Implemented
UK1502 # 07 Y:2015 07 2015 UPGRADE CONVEYORS $977 $480 Not Implemented
UK1502 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,284 $2,000 Implemented
UK1502 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,699 $10,183 Implemented
UK1502 # 10 Y:2015 10 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,342 $2,080 Implemented
UK1502 # 11 Y:2015 11 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,775 $1,000 Not Implemented
UK1502 # 12 Y:2015 12 2015 REPAIR AND ELIMINATE STEAM LEAKS $2,940 $300 Implemented
UK1502 # 13 Y:2015 13 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $48,323 $123,975 Not Implemented
UK1502 # 14 Y:2015 14 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $783 $1,200 Implemented
DL0142 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $16,089 $0 Implemented
DL0142 # 02 Y:2015 02 2015 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,900 $0 Implemented
DL0142 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $663 $3,900 Implemented
DL0142 # 04 Y:2015 04 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $21,578 $5,310 Implemented
DL0142 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $850 $8,225 Not Implemented
DL0142 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,065 $8,225 Not Implemented
DL0142 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $717 $1,890 Not Implemented
DL0142 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,080 $6,100 Not Implemented
DL0142 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,306 $4,840 Implemented
DL0142 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,255 $980 Implemented
SU0382 # 01 Y:2015 01 2015 USE SYNTHETIC LUBRICANT $362 $0 Not Implemented
SU0382 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,982 $1,901 Not Implemented
SU0382 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $394 $320 Not Implemented
SU0382 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,679 $10,400 Not Implemented
SU0382 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $220 $624 Not Implemented